Construction progress
Follow the project’s progress from the first foundation to handover. Every stage documented, every milestone communicated.
Coming soon
ForumConstructions
Superior Urban Standard
Precision at every stage, tested materials, attention to detail. We build for the decades ahead, not for handover day.
“Solid planning — Every construction begins with a clear strategy, a verified design and a prepared team.”
PHASE 1 · M14 & M15
Developer: City of Mara, with 10 years of activity and over 700 homes sold. Strategic partner: Hubix. An international hotel brand will also be part of the development.
height regime, plus 2 basement levels
apartments: 91 in M14, 112 in M15
underground parking spaces, across 3 functional levels
street mall & services on the ground floor of the development
Nearly Zero Energy Building energy class
start of works: March 2026 · estimated completion: June 2028
About the construction
Walls of 40 cm, 30 cm brick between apartments, 2.67 m to the ceiling. From the foundation to the final finishing layer, every decision counts.

25 cm brick or 30–40 cm structural diaphragm + 15 cm mineral wool + ventilated façade. Lower bills in winter, a cool apartment in summer.
Walls between apartments of 30 cm brick, with superior sound insulation. Partitions of 15 cm Ytong masonry or lightweight double-clad structure, with soundproofing.
2.67 m clear height in apartments, 5 m on the commercial ground floor, 3–3.5 m at the penthouse. Proportions designed for comfort, not for minimum standards.
The loggias are set back into the volume of the building, covered and closed on the sides, so they are sheltered from wind and rain. They have concrete parapets with metal handrails, and the façade windows have aluminum shutters.
Building insulation
Aluminum composite cladding of the Alucobond type or equivalent, mounted in a ventilated façade system, combined with CT74 silicone decorative plaster on a thermal system with mineral wool.

Water runs straight off the aluminum surface, leaving no marks. The material does not degrade over time, and the building looks new decade after decade.
A premium envelope protects the structure and maintains the resale value of each apartment. No faded façades, no costly periodic repairs.
FORUM identity
The portico is part of FORUM’s identity, and the landscaped garden above it gives the feeling of home.
Not a decorative element, but the conceptual foundation of the FORUM name. The structure that visually sets the development apart from any other building in Timișoara.
Above the portico, the 1st floor becomes a landscaped green space: roll-out lawn, anchored mature trees, planters and automated irrigation. Access is exclusive to residents.
The social heart of the development: paving of natural materials, ambient and architectural lighting, terraces animated by pedestrian flow. A semi-public space, sheltered from traffic.
“Beautiful and functional, in the same place: green spaces and hanging gardens that bring calm close to home.”
Energy efficiency
The NZEB class comes from three things: photovoltaic panels, a hybrid heat pump and a well-insulated envelope. Together, they keep consumption close to zero.
Photovoltaic panels with their own electricity production. Lower shared costs for all residents.
Heat pump plus gas boiler: a dual solution for maximum efficiency and supply security, regardless of the season.
Hot water production, managed by an automation verified on the European market. Constant performance, no worries.
NZEB stands for Nearly Zero Energy Building: a well-insulated envelope, 7-chamber window frames and energy from renewable sources, in line with the 2026 European standards.
Smart infrastructure
Spaces nobody is using go into the share parking system. Capacity rises by at least 60%, so you always find a space.
GROUND FLOOR · SLAB
BASEMENT 1 · S-1
BASEMENT 2 · S-2
underground parking spaces in Phase 1
extra capacity through share parking
free parking for customers of the commercial spaces
“Share parking means no longer building the city around empty spaces, but using existing infrastructure intelligently.”
DIRECTIONS
Explore the two pillars of our build quality.

Follow the project’s progress from the first foundation to handover. Every stage documented, every milestone communicated.
Coming soon
High-performance technical systems and carefully selected materials. The details that make the difference between a good home and an exceptional one.
DiscoverTHE NEXT STEP
See the available apartments in M14 and M15 or set up a conversation with a FORUM consultant.